Leeman Road RRAP
Rosehill Rail
Client: Trackwork
Project: Leeman Road RRAP
Details: Install a 6.3 Rosehill RRAP
Project: Leeman Road RRAP
Details: Install a 6.3 Rosehill RRAP
Premier Rail were assigned a cut to fit project which included installing a 6.3m Rosehill RRAP in S&C AV7 crossover with checkrails.
The specialist team at PRS cut the panels to fit the existing layout.
The team also completed the concrete approach works.
The Rosehill RRAP was installed to provide essential access to the train depot.