Premier Rail installed a 10.8m Rosehill interlocking RRAP for our client, TES 2000.
Case study Category: Rosehill Rail
Adelaide Footpath Crossing
A twin track 7.2m pedestrian footpath crossing was installed by Premier Rail…
Hull Crossing
Premier Rail were tasked to install a 26m base plated Rosehill crossing system…
Leeman Road RRAP
Premier Rail were assigned a cut to fit project which included installing a 6.3m…
Stromeferry Bypass
A set of complex engineering works on the rail infrastructure was…
Norbreck North Tramstop Blackpool
Installation of 400m² of Rosehill Base Plated System. Blackpool’s newest tram stop…