Premier Rail

Rail Projects
  • New Brighton Station

    GRP Access and Steps

    At New Brighton Station, Premier Rail Services replaced the worn stone stairs with new GRP steps.

    Read more
  • Alstom Depot GRP Walkway Project Case Study

    Open Grid GRP Walkway

    Premier Rail Installation of Open Grid GRP Walkway for Siding Access.

    Read more
  • School Vegetable Garden Project Case Study

    School Vegetable Garden

    Premier Rail Planted a Vegetable Garden to local School, Selby Park Academy.

    Read more
  • Malvern Walkway Pedestrian Crossing

    Walkway Pedestrian Crossing

    Premier Rail attended site located in Worcester to remove the pedestrian crossing.

    Read more
  • Canton Depot Cut to Fit

    Canton Depot Cut to Fit

    Premier Rail were asked by our client to supply & install 12.6m Rosehill base plated system.

    Read more
  • Brocklesby Crossing Upgrade

    Brocklesby Crossing Upgrade

    Premier Rail were asking to complete a Timber Crossing upgrade at Brocklesby.

    Read more
  • Silt Drove Rosehill Crossing

    Silt Drove Rosehill Crossing

    Premier Rail installed a 10.8m Rosehill interlocking RRAP for our client, TES 2000.

    Read more
  • Adelaide Footpath Crossing

    Adelaide Footpath Crossing

    A twin track 7.2m pedestrian footpath crossing was installed by Premier Rail…

    Read more
  • Hull Crossing

    Hull Crossing

    Premier Rail were tasked to install a 26m base plated Rosehill crossing system

    Read more

12 3 Next › Last »