Canton Depot Cut to Fit
Level Crossing Services

Client: Bam Nuttall
Project: Canton Depot Cut to Fit
Details: Supply and Install 12.6m Rosehill RRAP
Project: Canton Depot Cut to Fit
Details: Supply and Install 12.6m Rosehill RRAP
Premier Rail were asked by our client to supply and install 12.6m Rosehill base plated system, cut to fit through S&C.
The works were located in Cardiff.
The innovative rubber panels are sustainably and efficiently manufactured in the UK from 100% recycled tyre rubber. The panels are tough, durable, and engineered for long-term use.